Rooflights Only, Loft Conversion, in a "Half over the Passage" Hall Entrance Terrace House.
Total costs are £26,655 inclusive, January 2018.
Decoration and Carpet Excluded.
This Edwardian terrace is half over the passage with a 5.2 metre span between party walls.
Structurally one party wall was built over half of the passage and this had to be structurally checked.